SingleSpeed Brewing in Cedar Falls

BLOG

Concrete Bar Top

Posted on October 6, 2012 in SingleSpeed Brewing


Yesterday the concrete bar top was poured into the form. It will sit and “cure” for 2 weeks and then it will get flipped over and installed. Here is a short video of the bar top being tapped around the edge after the concrete was added.

More From SingleSpeed Brewing