Hanging Growlers at SingleSpeed Brewing

BLOG

  • Brewing!

    NOV. 20, 2012

    Last week Dave and Marty completed the first round of brewing. Dave from Premier Stainless Systems was also on-site to assist with the final tune-ups to the brewing equipment and to help brew a...

    Read more

  • Flooring is in

    OCT. 27, 2012

    Since the last post the flooring was installed, the bathroom tile was put in, the brick was sealed and the neon sign and awnings were put up. There is still quite a bit to do but it is mostly down to...

    Read more

  • Stack of Flooring

    OCT. 13, 2012

    This stack of flooring is getting installed next week. It was custom made by FishSticks Millwork in Janesville, Iowa. The wood is oak and will have a brushed/distressed...

    Read more

  • Bar Top Installed

    OCT. 12, 2012

    The concrete bar top setup faster than expected so this afternoon it was flipped over and installed. Flipped sounds so casual for a something that weighs 1000 pounds! It took 8 guys a few choice...

    Read more

  • Concrete Bar Top

    OCT. 06, 2012

    Yesterday the concrete bar top was poured into the form. It will sit and “cure” for 2 weeks and then it will get flipped over and installed. Here is a short video of the bar top being...

    Read more